Performance Measure

Percentage of pavements in Poor condition (Interstate System)

Associated Objectives

Percentage of pavements in Poor condition not to exceed X percent of the Interstate System

Service Packages that Support the Performance Measure

MC05-Roadway Maintenance and Construction
CVO03-Electronic Clearance
SU10-Center Maintenance
SU11-Field Equipment Maintenance
SU12-Vehicle Maintenance
SU13-Personnel Device Maintenance

Associated Goals

Maintain the highway infrastructure asset system in a state of good repair

Planning Factors

H. Emphasize the preservation of the existing transportation system;

Source

Pavement and Bridge Condition Performance Measures NPRM