Maint and Constr Management Center --> Archived Data System:
maint and constr archive data

Definitions

maint and constr archive data (Information Flow): Information describing road construction and maintenance activities identifying the type of activity, the work performed, and work zone information including work zone configuration and safety (e.g., a record of intrusions and vehicle speeds) information. For construction activities, this information also includes a description of the completed infrastructure, including as-built plans as applicable. Content may include a catalog of available information, the actual information to be archived, and associated meta data that describes the archived information.

Maint and Constr Management Center (Source Physical Object): The 'Maint and Constr Management Center' monitors and manages roadway infrastructure construction and maintenance activities. Representing both public agencies and private contractors that provide these functions, this physical object manages fleets of maintenance, construction, or special service vehicles (e.g., snow and ice control equipment). The physical object receives a wide range of status information from these vehicles and performs vehicle dispatch, routing, and resource management for the vehicle fleets and associated equipment. The physical object participates in incident response by deploying maintenance and construction resources to an incident scene, in coordination with other center physical objects. The physical object manages equipment at the roadside, including environmental sensors and automated systems that monitor and mitigate adverse road and surface weather conditions. It manages the repair and maintenance of both non-ITS and ITS equipment including the traffic controllers, detectors, dynamic message signs, signals, and other equipment associated with the roadway infrastructure. Weather information is collected and fused with other data sources and used to support advanced decision support systems.

The physical object remotely monitors and manages ITS capabilities in work zones, gathering, storing, and disseminating work zone information to other systems. It manages traffic in the vicinity of the work zone and advises drivers of work zone status (either directly at the roadside or through an interface with the Transportation Information Center or Traffic Management Center physical objects.)

Construction and maintenance activities are tracked and coordinated with other systems, improving the quality and accuracy of information available regarding closures and other roadway construction and maintenance activities.

Archived Data System (Destination Physical Object): The 'Archived Data System' collects, archives, manages, and distributes data generated from ITS sources for use in transportation administration, policy evaluation, safety, planning, performance monitoring, program assessment, operations, and research applications. The data received is formatted and tagged with attributes that define the data source, conditions under which it was collected, data transformations, and other information (i.e. meta data) necessary to interpret the data. The archive can fuse ITS generated data with data from non-ITS sources and other archives to generate information products utilizing data from multiple functional areas, modes, and jurisdictions. The archive prepares data products that can serve as inputs to federal, state, and local data reporting systems. The 'Archived Data System' may reside within an operational center and provide focused access to a particular agency's data archives. Alternatively, it may operate as a distinct center that collects data from multiple agencies and sources and provides a general data warehouse service.

Included In

This Triple is in the following Service Packages:

This triple is associated with the following Functional Objects:

This Triple is described by the following Functional View Data Flows:

This Triple has the following triple relationships:

Communication Solutions

Solutions are sorted in ascending Gap Severity order. The Gap Severity is the parenthetical number at the end of the solution.

Selected Solution

(None-Data) - Secure Internet (ITS)

Solution Description

This solution is used within Australia, Canada, the E.U. and the U.S.. It combines standards associated with (None-Data) with those for I-I: Secure Internet (ITS). The (None-Data) standards include an unspecified set of standards at the upper layers. The I-I: Secure Internet (ITS) standards include lower-layer standards that support secure communications between ITS equipment using X.509 or IEEE 1609.2 security certificates.

ITS Application Entity
Mind the gapMind the gapMind the gap

Development needed
Click gap icons for more info.

Mgmt
Facilities
Mind the gap

Development needed
Security
Mind the gapMind the gap
TransNet
Access

Internet Subnet Alternatives
TransNet TransNet

TempBCL2 TempSTDL2

TempBCL3 TempSTDL3

TempBCL4 TempSTDL4

TempBCL5 TempSTDL5

Access Access

TempBCL2 TempSTDL2

TempBCL3 TempSTDL3

TempBCL4 TempSTDL4

TempBCL5 TempSTDL5

ITS Application ITS Application

TempBCL2 TempSTDL2

TempBCL3 TempSTDL3

TempBCL4 TempSTDL4

TempBCL5 TempSTDL5

Mgmt Mgmt

TempBCL2 TempSTDL2

TempBCL3 TempSTDL3

TempBCL4 TempSTDL4

TempBCL5 TempSTDL5

Facility Facility

TempBCL2 TempSTDL2

TempBCL3 TempSTDL3

TempBCL4 TempSTDL4

TempBCL5 TempSTDL5

Security Security

TempBCL2 TempSTDL2

TempBCL3 TempSTDL3

TempBCL4 TempSTDL4

TempBCL5 TempSTDL5

Note that some layers might have alternatives, in which case all of the gap icons associated with every alternative may be shown on the diagram, but the solution severity calculations (and resulting ordering of solutions) includes only the issues associated with the default (i.e., best, least severe) alternative.

Characteristics

Characteristic Value
Time Context Historical
Spatial Context Regional
Acknowledgement True
Cardinality Unicast
Initiator Destination
Authenticable True
Encrypt True


Interoperability Description
Regional Interoperability throughout the geopolitical region is highly desirable, but if implemented differently in different transportation management jurisdictions, significant benefits will still accrue in each jurisdiction. Regardless, this Information Flow Triple should be implemented consistently within a transportation jurisdiction (i.e., the scope of a regional architecture).

Security

Information Flow Security
  Confidentiality Integrity Availability
Rating Moderate Moderate Low
Basis While this flow should not include any PII, as any PII in the underlying data should be stripped prior to being sent to an archive, this is not guaranteed. Even if PII is all removed prior, this flow is very large in scope and its compromise to unintended recipients may enable large scale data analysis that compromises personal information through circumstantial, aggregative or other combinatorial analysis. May include performance information that needs to be timely and correct so that errors may be identified and corrected. Large in scope so any errors effects may be magnified. Not a real time service, so intermittent availability should suffice.


Security Characteristics Value
Authenticable True
Encrypt True