deviation_response_to_protect_connection

This data flow provides the response from the Manage Transit Vehicle Deviations process on whether a bus/vehicle will be able to deviate from the schedule in order to protect a transit user's connection within the same agency, i.e. "Hold" the next transit vehicle. This may include the maximum time that the next vehicle will be allowed to wait before leaving.

Sub Data Flows

Parent Data Flows

Associated PSpecs/Terminators